


Kid's Slackline Partial Frame (A-Frame) for Training with a Tree
Tax included. Shipping calculated at checkout
With this Kid's Slackline partial frame (A-Frame) you have the option of practicing slacklining with just one tree or anchor point. This set contains all the necessary parts.
The Kid's Slackline partial frame set contains:
- Basic slackline: Line width: 50 mm (flat band); length: 10 meters
- 2 x stainless steel shackle with screw bolt
- 1 x 2 m long round sling flexitube - for attaching to trees or other fixed points
- G-ratchet with ratchet protection
- 1 x A-Frame Vario made of wood with impact protection height 72 cm / 50 cm
- backpack bag
- Fixpoint: Please select above
Ground screw anchor: 1 x 120 cm length, made of round steel, galvanized
Ground anchor: 1 x 105 cm length, material: die-cast aluminum with steel wire rope, 1 x drive rod to be ordered separately
Concrete anchor: 1 x 40 cm height, material: iron, galvanized
Select your desired fixed point:
Ground screw anchor: The ground screw anchor is intended exclusively for permanent anchoring in natural ground and NOT for repeated screwing in and out.
Ground anchor: The ground anchor is ideal for difficult ground such as stony or clayey soil. With the help of a drive rod, it is driven firmly into the ground and anchors itself in the ground with a specific mechanism.
Please note that you need the drive rod to install the ground anchor! This must be ordered separately and is not automatically included in the delivery.
Concrete anchor: The concrete anchor is ideal for setting in concrete in solid ground. The required foundation should be approx. 80 x 80 x 80 cm. This fixing point is recommended especially for public facilities such as slackline parks or kindergartens, as the lines are subject to a lot of wear and tear. Another advantage is that several lines can be attached at the same time. The eyelet with threaded screw can be unscrewed without any problems if necessary and does not even get in the way when mowing the lawn, for example.
Please refer to the assembly instructions included in the delivery for information on how to attach the various fixing points.
assembly
Fasten the selected fixing points as described in the enclosed instructions. Then simply place the line over the frame and fasten it with the tree loop around the second fixing point. The robust G-Link ratchet allows the line to be tightened as required. Depending on what is on the training plan, the tension can be adjusted to be lighter or stronger in just one movement. It's that easy to set up your own training course.
